India’s Tejas ready for IAF induction in March 2012

Flight International

Two of the Indian Aeronautical Development Agency’s Tejas Mk 1 light combat aircraft will be ready for induction by March 2012.So far, 1,659 flight tests of the Tejas have been conducted, said defence minister AK Antony. The Indian Air Force has ordered forty Mk 1s, 20 with “initial operating clearance standard” and 20 with “final operation clearance standard”, he added.

Antony’s comments were in response to a query from a member of parliament about the status of the indigenous fighter programme. The Tejas Mk 1, which is produced by Hindustan Aeronautics (HAL), received initial operational clearance on 11 January.

He also discussed the costs of the programme. In 2001, this was estimated at Indian rupees (Rs) 33 billion ($740 million), but cost overruns added an additional Rs24.8 billion to this.

“The additional cost was to meet the expanded scope of the programme, increased cost of materials, manpower, and maintenance of facilities,” he said.

Separately, a two-seat prototype of a naval version of the Tejas Mk I aircraft could have its first flight within the next three months.

The General Electric F404-IN20-powered aircraft is undergoing ground integration tests at HAL’s facility in Bengaluru, said a senior official involved in the programme.

Share this: Twitter | StumbleUpon | Facebook | Delicious | digg | reddit | buzz

Short URL: http://iafnews.nuvodev.com/?p=1638

Posted by pilotpaul on Aug 8 2011. Filed under All News. You can follow any responses to this entry through the RSS 2.0. Both comments and pings are currently closed.

Comments are closed

Search Archive

Search by Date
Search by Category
Search with Google
Log in
Image source is from the Wikimedia Commons.Commons is a freely licensed media file repository.
Website Design Bangalore | Bangalore Web Design | Website Design India | Domain Registration Bangalore | Web Hosting India | Bangalore Web Hosting